Traduccion en castellano de esta pagina
 
 
  Printing Instructions

  HDPE & LLDPE
  Liner Specs


  Drainage Net &
  Geocomposite


  Polyethylene Embed
  Channel


  Chemical Resistance
  Information


  Fingerprinting
  Properties


  Fusion & Extrusion
  Welding


  Liner Panel
  Deployment


  Design Details

  Installation QA Forms

  Geomembrane
  Manufacturing


  Geomembrane
  Installation

    Definitions / Parties
    Personnel Qualifications
    Meetings
    Material Logistics
    Earthwork
   
Liner Deployment
    Weather Conditions
    Seaming Equip. & Accs.
    Hot Wedge Welding
    Extrusion Fillet Weld.
    Unusual Conditions
    Field Seam Test Procd.
    Backfill Anchor Trench
    Geomembrane Accept.
    Break Codes/Seams (dl)
    Break Codes/Seams (ex)
    Installation Flow Chart

 
1.  DEFINITIONS
 
Construction Quality Control (CQC) is a planned system of routine inspections that is used to directly monitor and control the quality of a construction project.

Construction Quality Assurance (CQA) is independent of the CQC and includes inspections, verifications, audits, and evaluations of materials and workmanship necessary to determine and document the quality of a construction project.

2.  PARTIES

This manual references different parties which may be involved in the liner installation process. A successful liner installation depends on the responsible and timely interaction of all involved parties and coordination of all installation, inspection, testing, and documentation.

Owner Owner of the property and/or facility; responsible for the final acceptance of the work done on his property/facility.
 
Designer Architectural and/or engineering entity responsible for project planning, design, specifications, and drawings. The designer may also be the project manager.
 
Project Manager Authorized representative of the owner; in charge of project scheduling and coordination of construction activities.
 
General Contractor Prime contractor for the project; may delegate specific tasks in a contractual agreement to one or more subcontractors. The general contractor is sometimes the liner system installer and/or the earthwork contractor.
 
Liner System Installer Subcontractor for the complete installation of the synthetic liner system; must perform according to its contract with the owner or the general contractor.
 
Liner Manufacturer (Poly-Flex, Inc.) manufacturer of the geomembrane from raw material (resin).
 
Soil CQA Consultant Party, independent of the general contractor and the liner installer, in charge of monitoring, testing, inspecting, and documenting all earthwork. Also called soil inspector.
 
Geosynthetic CQA
Consultant
Party, independent of the general contractor and the liner installer, who monitors, tests, inspects, and documents the installation of all geosynthetic materials, i.e. geomembranes, geotextiles, geonets, and geogrids. Also called third party CQA or liner inspector.
 
Independent Laboratory Testing laboratory unaffiliated with the geosynthetic material manufacturer, installer, or the general contractor for a project.


 
    
 search words or keywords :  

  [Get
Home Products Technical Company Info News FAQ Site Map Contact Us Español
 
Poly-Flex, Inc. • 2000 W. Marshall Dr. • Grand Prairie, TX 75051 U.S.A. • 888-765-9359
© Poly-Flex, Inc. • All Rights Reserved