14. BACKFILLING OF ANCHOR TRENCH
Unless otherwise specified, the anchor trench shall be backfilled and compacted by the earthwork contractor. Trench backfill material shall be placed and compacted according to project specifications.
Care shall be taken when backfilling the trenches to prevent any damage to the geomembrane.
15. GEOMEMBRANE ACCEPTANCE
The liner installer shall retain ownership and responsibility for the liner until installation is finished and verification of the adequacy of all field seams and repairs, including associated testing, is complete, at which time the owner shall accept the liner and assume ownership and full responsibility for it.
|