Traduccion en castellano de esta pagina
 
 
  Geomembrane
  Manufacturing


  Geomembrane
  Installation

      Definitions / Parties
      Personnel Qualifications
      Meetings
      Material Logistics
      Earthwork
      Liner Deployment
      Weather Conditions
      Seaming Equip. & Acces.
      Hot Wedge Welding
      Extrusion Fillet Welding
      Unusual Conditions
      Field Seam Test Procdrs.
      Backfilling Anchor Trench
      Geomembrane Acceptance
      Break Codes for Seams (dual)
      Break Codes for Seams (extr)
      Installation Flow Chart
      Workmanship Warranty
      Installation QA Forms
      • Daily Progress Rpt. (p1)
      • Daily Progress Rpt. (p2)
      • Subgrade Acceptance
      • Trial Seam Log
      • Panel Placement Log
      • Seaming Record
      • Seam Test Record
      • Repair Log
      • Destruct. Sample Log
      • Cert. of Acceptance

  Drainage Net &
  Geocomposite Manuf.
  QC & QA

 
1.  DEFINITIONS

Construction Quality Control (CQC) is a planned system of routine inspections that is used to directly monitor and control the quality of a construction project.

Construction Quality Assurance (CQA) is independent of the CQC and includes inspections, verifications, audits, and evaluations of materials and workmanship necessary to determine and document the quality of a construction project.

2.  PARTIES

This manual references different parties which may be involved in the liner installation process. A successful liner installation depends on the responsible and timely interaction of all involved parties and coordination of all installation, inspection, testing, and documentation.

Owner Owner of the property and/or facility; responsible for the final acceptance of the work done on his property/facility.
 
Designer Architectural and/or engineering entity responsible for project planning, design, specifications, and drawings. The designer may also be the project manager.
 
Project Manager Authorized representative of the owner; in charge of project scheduling and coordination of construction activities.
 
General Contractor Prime contractor for the project; may delegate specific tasks in a contractual agreement to one or more subcontractors. The general contractor is sometimes the liner system installer and/or the earthwork contractor.
 
Liner System Installer Subcontractor for the complete installation of the synthetic liner system; must perform according to its contract with the owner or the general contractor.
 
Liner Manufacturer (Poly-Flex, Inc.) manufacturer of the geomembrane from raw material (resin).
 
Soil CQA Consultant Party, independent of the general contractor and the liner installer, in charge of monitoring, testing, inspecting, and documenting all earthwork. Also called soil inspector.
 
Geosynthetic CQA
Consultant
Party, independent of the general contractor and the liner installer, who monitors, tests, inspects, and documents the installation of all geosynthetic materials, i.e. geomembranes, geotextiles, geonets, and geogrids. Also called third party CQA or liner inspector.
 
Independent Laboratory Testing laboratory unaffiliated with the geosynthetic material manufacturer, installer, or the general contractor for a project.


 
    
search:       
  [Get
Home Products Technical Company Info News FAQ Site Map Contact Us Español
 
Poly-Flex, Inc. • 2000 W. Marshall Dr. • Grand Prairie, TX 75051 U.S.A. • 888-765-9359
© 1997 - 2001 Poly-Flex, Inc. • All Rights Reserved